[Opm] Change in solver time Model2
Markus Blatt
markus at dr-blatt.de
Thu Dec 1 13:47:29 UTC 2016
Hi,
On Thu, Dec 01, 2016 at 11:57:59AM +0000, Tor Harald Sandve wrote:
> I think this is due to #916
>
> linear_solver_maxiter was changed from 75 to 150
> which removes many of the linear solver convergence issues.
>
That is weired. I checked the runs of flow_legacy last Friday and it
still used 75 steps, see
https://github.com/OPM/opm-simulators/issues/955
Maybe I did something wrong. I will recheck.
Markus
--
Dr. Markus Blatt - HPC-Simulation-Software & Services http://www.dr-blatt.de
Hans-Bunte-Str. 8-10, 69123 Heidelberg, Germany, USt-Id: DE279960836
Tel.: +49 (0) 160 97590858
More information about the Opm
mailing list