Opm::Parameters::NewtonTargetIterations Struct Reference The number of iterations at which the Newton method should aim at. More...
Detailed DescriptionThe number of iterations at which the Newton method should aim at. This is used to control the time-step size. The heuristic used is to scale the last time-step size by the deviation of the number of iterations used from the target steps. Member Data Documentation◆ value
The documentation for this struct was generated from the following file: |
|||||||||